Quality control

Quality control that keeps your line running

Taokron has supplied HVAC ductwork machinery worldwide since 1995. Every machine is built under an ISO 9001:2015 quality management system and shipped under CE conformity to the EU Machinery Directive. This page explains how quality is controlled at each stage of the build cycle, what the buyer should expect at FAT, and which documents travel with the machine to your factory.

The four QC stages every Taokron machine passes through

Taokron quality control is structured around four explicit checkpoints. Each one has a documented procedure, a responsible engineer, and a record that travels with the machine for the lifetime of the asset. None of the four can be skipped, and no machine ships without all four signatures complete.

1. Incoming material and component inspection

Every coil, casting, motor, gearbox and PLC that enters the production facility is logged against an approved supplier list and inspected against a documented incoming standard. Steel coils are checked for thickness, surface coating weight (Z180/Z275 galvanising), edge condition and coil ID. Castings and structural steel are dimension-checked against the drawing. Electrical components are verified against the original packaging serial number and the manufacturer's certificate of compliance — Taokron does not accept ungraded or unbranded electricals on any production machine. Components that fail incoming inspection are quarantined in a separate hold area and returned to the supplier with a non-conformance report. The non-conformance log is reviewed quarterly and feeds back into the approved-supplier list.

2. In-process inspection during manufacture

Taokron machines are built around a sequence of machining and assembly stations: structural steel cutting and welding, machined surface preparation, sub-assembly of forming heads or fold stations, electrical cabinet build, and final integration. Each station has a dedicated inspection step with a checklist signed by the operator and counter-signed by the QC engineer for that area. Critical-to-function dimensions — spindle alignment, roller parallelism, hydraulic pressure setting, motor torque calibration — are recorded against the drawing tolerance, not just visually checked. Any deviation triggers a re-work order before the sub-assembly moves to the next station. The machine cannot reach the test bay until every in-process checklist is complete.

3. Functional and electrical machine testing

Once the machine is fully assembled, it moves to the dedicated test bay where Taokron runs the full electrical safety, PLC program, mechanical run-in and load test. Insulation resistance, earth bond continuity and emergency stop function are tested to IEC 60204-1 standards before the machine is energised. The PLC program is loaded from a checksummed master copy and verified against the build sheet. The machine then runs the full diameter program (or duct size program for rectangular machines) at no-load and at design load using Taokron stock galvanised coil. Cycle times, motor currents, hydraulic pressures and seam quality are recorded. Any deviation from the design envelope triggers a hold and an engineering review.

4. Pre-shipment factory acceptance test (FAT)

The FAT is the final QC stage and the most important one for the buyer. Taokron schedules the FAT date with you at order confirmation and sends a formal invitation 2–3 weeks ahead. The test runs 1–2 days at the production facility and includes: a walk-around of the assembled machine; a full diameter or duct size program run using your nominated coil and your target output; measurement of seam continuity, straightness, cut squareness, and tolerance; review of the build sheet, electrical schematic, lubrication chart and operator manual; and a Q&A session with the Taokron project engineer who will travel for commissioning. The buyer's authorised engineer signs the FAT report alongside the Taokron engineer. A signed FAT report is the trigger for final payment release on most contracts.

Standards and certifications

Taokron operates under the following formal standards and certifications:

  • ISO 9001:2015 — quality management system covering the design, manufacture, FAT and after-sales service of HVAC ductwork machinery at the production facility. Audited annually by an accredited certification body.
  • CE marking — under the EU Machinery Directive 2006/42/EC, with technical file, risk assessment and Declaration of Conformity travelling with each machine that ships to a CE territory.
  • SMACNA HVAC Duct Construction Standards — Taokron machines are designed to produce duct that meets SMACNA gauge, seam and pressure-class requirements out of the box.
  • EN 1505 / EN 1506 — rectangular and round duct dimensional standards for the European market; Taokron tooling is available in metric and imperial profiles to match.
  • AS/NZS 4254 — Australian and New Zealand HVAC duct construction standard, supported by the Taokron Australia office in Box Hill North, VIC.

Document pack that ships with every machine

Every Taokron machine arrives at your factory with a complete document pack in a sealed waterproof envelope inside the electrical cabinet. The standard contents are: signed FAT report; CE Declaration of Conformity (where applicable); ISO 9001 certificate copy; operator manual in English (and additional languages on request); electrical schematic; pneumatic and hydraulic schematic where applicable; spare parts list with Taokron part numbers; lubrication chart; and warranty card. Buyers can also request a detailed QC trace report covering every in-process checklist sign-off — this is sometimes required by buyers in regulated industries (pharmaceutical, semiconductor, aerospace) and Taokron will produce it within 5 working days of the request.

What happens if something fails QC after delivery

Taokron standard warranty is 12 months from commissioning, covering all mechanical and electrical components except wearing parts. Within the warranty period, Taokron will diagnose any quality-related fault remotely (we hold the machine schematic and the PLC backup) and either ship a replacement part by air freight or dispatch a technician to the buyer's factory, depending on the fault. After the warranty period, Taokron continues to supply spare parts at catalogue prices for the lifetime of the machine — the oldest Taokron machines still running in the field were commissioned in the late 1990s and we still keep their parts in stock or in the production schedule. Speak to the Taokron technical support team early; the workshops with the lowest downtime are the ones who pick up the phone before a problem becomes a stoppage.

The full after-sales process — on-site installation and commissioning, operator training, the 12-month warranty, the 72-hour support response and lifetime spare parts — is set out on the installation, commissioning and after-sales support page.

Frequently asked questions

Is Taokron ISO 9001:2015 certified?

Yes. Taokron holds an active ISO 9001:2015 quality management certificate covering the design and manufacture of HVAC ductwork machinery at the production facility. The certificate is renewed on schedule and audited by an accredited certification body.

Are Taokron machines CE marked?

Yes. Taokron machines are CE marked under the EU Machinery Directive 2006/42/EC. Each machine ships with a Declaration of Conformity, the technical file references and the operator manual translated into English (with additional languages available on request).

Can I attend the factory acceptance test?

Yes — Taokron encourages every buyer to send an authorised engineer to the FAT. The test typically runs 1–2 days at the production facility using your nominated coil and your target program. We also offer a video FAT for buyers who cannot travel.

What does the pre-shipment inspection cover?

Pre-shipment QA covers electrical safety, PLC program checksum, mechanical alignment, lubrication, packing integrity, container sealing, and final document pack (FAT report, CE Declaration of Conformity, operator manual, parts list, electrical schematic and warranty card).

What is the warranty period?

Standard Taokron warranty is 12 months from commissioning, covering all mechanical and electrical components except wearing parts. Extended warranty packages are available on the larger lines such as SBAL-V and SBTF-2020.

Request a quotation →

12-hour reply

Have a specific QC question, a third-party audit requirement or a buyer-specific quality clause? An Taokron QA engineer replies within 12 hours.

Ask QA

ISO 9001:2015 and CE certification are just two of the ten reasons buyers short-list Taokron. The full comparison — including the three scenarios where Taokron is not the right fit — is on the why choose Taokron page.